Uncategorized

Seapony Pottery Studio

Been helping Seapony Pottery with their new open-air studio space. We’re building a cinder-block retaining wall to mitigate flooding, then framing out the roof! Exciting stuff. Here are some before-ish photos.

studio_01

This is the space, part of it is currently covered, we’ll be building out a corrugated roof over the area marked with the cinder-blocks.

studio_03

Here’s some of the reclaimed roofing we’ll be using. Still a bunch of cleanup to do but progress is being made. I’ll post more photos as the blocks go down and the framing goes up!

Standard

Leave a Reply